Oct 14 at 15:34 comment added Chris H 10 years on, the answer is more relevant - installations in the UK have a maximum export rate, which can be as low as 3.6kW. Mine is 5kW, but my panels can produce 7kWp. I also have a battery and can adjust when I charge, but still end up wasting power in summer. A dump load would be useful there (@410gone, in case you are still around)
Mar 11, 2014 at 16:15 comment added 410 gone Hello there, and welcome. Thanks for this answer. It might be worth emphasising that this solution is specific to places such as Britain where grid exports aren't metered, so there's no economic value to them.