Recently I have installed a set of 10 panels connected in series with 1 single Inverter. I have realised that for the first 2 hours 2 PVs have a cast shadow on them from a neighbourhood tank (that cannot shoot down :) ) and this will reduce the overall current of the system to the bare minimum.
I was thinking of using a timer to bypass the 2 PVs and take energy from the 8 remaining PVs for the first 2 hours. I was thinking of fitting 2 MC4 T-Connectors.
Should this incurr any implications due to short circuit currents in the last 2 PVs. Should I insert a low OHm load just in case?