How many vessel-days does it take to build an offshore wind farm, per turbine or per megawatt? I notice that when an offshore wind farm is being built, there are quite a few vessels milling around: vessels for shuttling crew, surveying, heavy-lifting cranes, cable-layers, accommodation, pile-drivers.
Looking at all those vessels, and the total capacity, is there a typical number of vessel-days (i.e the number of days spent, per vessel, summed across all vessels) per unit of installation - per turbine, or per megawatt?
I've been watching the vessels move on marinetraffic.com, and keeping an eye on the 4C Offshore register of vessels used on offshore wind farms: even on completed wind farms such as the London Array, there's a lot of ongoing boat activity: